Access the Full Project by Clicking here!
Bidjugde
JOB
Williamson Valley Road Box Culvert Extension
BID DATE
10/1/20 - 1:30
AGENCY
Yavapai County
ESTIMATE
n/a
SCOPE
The scope of work for this project includes furnishing of all labor, materials, equipment, fixtures, and services required for the extension of an existing 96” x 84” concrete box culvert under Williamson Valley Road, including 21’ barrel extensions with cut off walls on each end and new inlet and outlet wingwalls per ADOT standard details. The total length of the box culvert extensions is 42’. The work is located on Williamson Valley Road between Kelly Drive to the north and Mcintosh Drive to the south. Other associated work includes channelization of the existing wash for approximately 40’ upstream and downstream of the new extensions, slope construction to extend the roadway slopes, and backfill for the culvert and wing wall construction. http://www.planroomdirect.com/project/williamson-valley-road-box-culvert-extension-in-yavapai-county-az--project-1822076 MaryAn.Sala@yavapai.us
PREBID
9/22/2020 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT