Access the Full Project by Clicking here!
Bidjugde
JOB
200 South Water Main Improvements
BID DATE
10/6/20 - 4:00
AGENCY
American Fork
ESTIMATE
n/a
SCOPE
Construct approximately 6,600 total linear feet of ductile iron water main in 200 South from Mill Pond Road to 1100 West and from 900 West to 300 West. Also connect to existing water lines at each intersection. Work includes excavation, backfilling, and pavement restoration, and installing service connections, fire hydrants, air vacs, blow offs, valves, and fittings as shown in the project drawings. Work also includes jacking and boring a 42-inch steel casing approximately 150 feet long under the existing railroad tracks, which must be coordinated with UTA and UPRR. Aaron Wilson +1 801-763-3060 ext. 662 awilson@afcity.net AF City Bids +801 (763) 3060 bids@afcity.net Ryan Kitchen ryan@pepg.net
PREBID
9/15/2020 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT