Access the Full Project by Clicking here!
Bidjugde
JOB
El Rio Preserve CMID Connection
BID DATE
09/22/20 - 3:00
AGENCY
Marana
ESTIMATE
n/a
SCOPE
The project is generally described as the construction of a new turnout facility situated along an existing Cortaro-Marana Irrigation District (CMID) owned and operated, 48-inch diameter, underground pipe run to enable the delivery of pumped ground water through an existing drainage structure crossing underneath Coachline Boulevard into a pond located within the Town of Marana owned El Rio Preserve. The work shall include furnishing all necessary labor, materials, tools, equipment, and incidental items to complete the aforementioned improvement in accordance with relevant plans, specifications, and supplemental information. Rudy Torres (520) 382-1983 rtorres@maranaaz.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT