JOB
Concrete Alley Street Replacement
BID DATE
09/22/20 - 10:00
AGENCY
Newport Beach
ESTIMATE
$1,370,000
SCOPE
The work necessary for the completion of this contract consists of, but is not limited to,(1) distributing notices to affected residents; (2) traffic control; (3) construction surveying; (4) removing existing asphalt or concrete streets/alleys, alley approaches,sidewalks, cross gutters, curb and gutter, and private driveways; (5) constructing new concrete streets/alleys, alley approaches, sidewalks, cross gutters, curb and gutter, and private driveways; (6) adjusting City utilities to grade; (7) installing new traffic striping,pavement markers, and traffic detector loops; (8) coordinating with outside utility owners to have their facilities raised to grade; (9) installing new bollard and concrete foundation;(10) removing existing hardscaping, pavement, and landscaping as needed for contract work; and (11) and other incidental items to be completed in work places required by the Contract Documents. All construction for the work shall reference these Special Provisions, the Standard Specifications and all Contract related documents, and Appendices. Patricia Kharazmi - 949-644-3344 pkharazmi@newportbeachca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT