Access the Full Project by Clicking here!
Bidjugde
JOB
4th Avenue Well
BID DATE
09/18/20 - 2:00
AGENCY
Salt Lake
ESTIMATE
$2,053,000
SCOPE
Demolition of the existing underground culinary well and site appurtenances located in an existing City park and adjoining streets, construction of an approximately 510-feet² above ground culinary well building with an electrical enclosure fence and associated landscaping. The building will be of constructed of concrete masonry units with a brick veneer. It will have a drilled concrete pier foundation. Construction also includes the mechanical and electrical components of the well building (including a new 4,200 gpm vertical turbine pump and motor). Connection of the well building to the existing water system includes construction of approximately 27-feet of 16-inch welded steel pipe and 52-feet of 16-inch ductile iron pipe, a flow meter manhole, and a connection to the existing 24-inch PCCP culinary main. Work also includes additional other site work and appurtenances including a 6-inch sewer lateral connection, sidewalk repairs, curb/gutter repairs, asphalt concrete repairs, and tree limb and root trimming. Kevin Kranendonk +801 (483) 6841 kevin.kranendonk@slcgov.com
UPDATES