Access the Full Project by Clicking here!
Bidjugde
JOB
Cypress Ave South Side Channel Restoration Enhancement
BID DATE
09/22/20 - 3:00
AGENCY
Redding
ESTIMATE
$2,050,000
SCOPE
This project includes the installation of 2 bridges on the floodplain of the Sacramento River, south of Cypress Avenue in the Henderson Open Space. The North Bridge will be 80-feet long and 12-feet wide to accommodate maintenance vehicle access. The South Bridge is intended for pedestrian access only and is 80-feet long and 8-feet wide. The bridges will provide vehicle and pedestrian access in the park after an off-channel slamonid habitat restoration project (to be constructed under a separate contract) is implemented. Construction activities include driving steel piles to support the bridge abutments, casting in place concrete abutments and wingwalls, installing earthen filled bridge approach ramps, excavating side channel subeaches passing through the bridges, installing scour protection, and installation of prefabricated bridges that are designed by the Contractor. Contractor shall also be responsible for clearing and grubbing vegetation within the project limits shown on the plans, tree trimming to accommodate equipment access on existing access roads, and relocating historic bridge piers. Contractor will also need to coordinate bridge construction activities concurrent with the habitat restoration construction activities, which will be responsible for initial site access and staging, constructing a majority of the side channel, sorting excavated material into size classes to be used by both projects, and planting riparian vegetation. A pre-project meeting is scheduled for Sep 10, 2020 - 10:00 am https://ciplist.com/plan/?Redding/city/13032/plan/3653
PREBID
9/10/2020 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT