Laton Pedestrian Drainage Improvements
BID DATE
09/3/20 - 2:00
AGENCY
Fresno County
ESTIMATE
$2,690,000
SCOPE
The work to be done consists, in general of widening existing roads and constructing new sidewalk, curb and gutters along Bliss, Murphy, Fowler, and Gonser Avenues, relocating several water meters and potable lateral water lines, and removal of 13 trees. A Hot Mix Asphalt walkway will be constructed along Latonia Avenue. In addition, a flashing pedestrian crossing sign will be installed on Fowler Avenue and Latonia Avenue. A new storm drainage system (i.e. drain inlet, manholes and storm drainage pipe) will also be installed and connected to the existing system. Two concrete culverts ("A" Ditch and Grant Canal) will be widened to accommodate the pedestrian sidewalk and improve safety. An existing sewer pipeline under the culverts will need to be modified as part of the project. DesignServices@fresnocountyca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT