Access the Full Project by Clicking here!
Bidjugde
JOB
Bardin Road Safe Routes School Improvements
BID DATE
09/22/20 - 2:00
AGENCY
Salinas
ESTIMATE
$9,878,844
SCOPE
In general, the work shall include, but is not limited to mobilization; surveying and construction staking; removal and salvage or disposal of existing improvements; erosion control, roadway reconstruction, full depth reclamation (FDR-C), slurry seal, construction of curb and gutter, sidewalk, ADA compliant pedestrian access ramps, drainage improvements, lighting improvements, electrical improvements, street lighting, utility trenching, landscape and irrigation improvements; signing and marking; replacement of sewer main; and all incidental and appurtenant improvements and restorations specified on the Plans and herein these Special Provisions.Schedule A includes the items above for the construction of two roundabouts, one at E. Alisal St and Bardin Rd, and one at Alisal Rd and Sconberg Pkwy, and construction of school drop off zone for Bardin Elementary School.Schedule B includes the items above for the construction of multiple bulbouts along Bardin Rd and E. Alisal St and pavement rehabilitation (FDR-C and slurry seal).Schedule C includes the items above for the reconstruction of ADA curb ramps and pavementrehabilitation (FDR-C) within the County's jurisdiction.Schedule D includes the replacement of portions of the sewer main in Bardin Road and East Alisal Street. Maria Contreras - 831-758-7429 mariac@ci.salinas.ca.us ; jonathane@ci.salinas.ca.us
UPDATES