Access the Full Project by Clicking here!
Bidjugde
JOB
Snowflake Heights Water Tank Rehab
BID DATE
10/20/20 - 3:00
AGENCY
Snowflake
ESTIMATE
n/a
SCOPE
Install 8-inch drain near bottom of existing tank - Install 2-inch drain as close to bottom of existing tank as possible - Remove existing sampling port and replace with 2-inch sampling port - Install 8-inch 45� fitting on inside inlet of existing tank - Install new 36-inch diameter manway on south side of existing tank - Sandblast and paint inside of existing tank, including floor, walls and roof - Remove approximately 6-inches of one side of existing overflow weir box of overflow pipe - Connect and weld top of existing ladder to existing handrails at top of existing tank - Weld ladder cage in at least three (3) locations where welds have broken and/or the metal has cracked - Install locking cage at the base of the ladder - Remove and install new depth gauge with new piping and float - Replace existing overflow pipe with a 10-inch overflow pipe - Remove old 6-inch overflow pipe and weld patch over hole - Disinfect water tank Painted Sky Engineering & Survey, located at 176 N. Main Street, Snowflake, AZ 85937, (928) 537-7218
PREBID
10/6/2020 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT