Access the Full Project by Clicking here!
Bidjugde
JOB
East Elk Grove GWTP Filter No 4 System Improvement
BID DATE
09/17/20 - 2:00
AGENCY
Sacramento County
ESTIMATE
$900,000
SCOPE
In general, the work to be performed under this contract includes the furnishing of all labor, materials, and equipment for construction of one (1) filter vessel system including: (1) new reclaim pump, installation of (1) new fluoride pump skid and the replacement of (3) existing fluoride pump skids with (3) new fluoride pump skids, (1) new fluoride control panel and the replacement of (3) existing fluoride control panels with (3) new fluoride control panels, installation of a new fiberglass enclosure including a new fluoride storage tank, scale and scrubber; including but not limited to all associated piping, valves, site electrical, controls, instrumentation, permits, security, purchase and installation of pumps and motors, paving and grading, and other appurtenances, tests and or work as necessary for a working filter vessel system. The work shall be accomplished within the project boundaries as shown or described on the Contract Drawings. https://www.publicpurchase.com/gems/bid/bidView?bidId=131606&&sso=f1387a3d754d1a2268a73aae358b3a9c Tan Nguyen (916) 874-7112 nguyentan@saccounty.net
PREBID
8/27/2020 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT