Citywide Street Resurfacing - Oakland
BID DATE
03/6/14 - 2:00
AGENCY
Oakland
ESTIMATE
$5,141,000
SCOPE
The proposed work consists, in general, of the construction of approximately 182,886 SY of full-width milling; 11,529 tons of AC base repairs; 21,941 tons of AC overlay; 19,568 SY of Slurry; 159 concrete curb ramps (all types); the replacement of 9,905 SF of concrete sidewalk; 1,079 LF of concrete curb and gutter; 132,500 LF of various types of traffic striping; 36,616 SF of pavement markings; and other work specifically shown on the project plans or included in the Special Provisions. Jimmy Mach at 510-238-3303, jmach@oaklandnet.com