Access the Full Project by Clicking here!
Bidjugde
JOB
Victoria Drive Infrastructure Improvements Phase I
BID DATE
08/5/20 - 2:00
AGENCY
Fullerton
ESTIMATE
$2,119,000
SCOPE
The Work shall consist of, but not limited to, removing and installing VCP sewer pipe and related appurtenances and reconstruction of sewer manholes; abandoning and removing existing water main piping and appurtenances, furnishing and installing new water main piping and appurtenances; replacing concrete structures, including sidewalk, curb and gutter, cross gutter and spandrels, driveways, and access ramps; cold milling pavement and asphalt concrete overlay; pulverizing existing roadway section, constructing cement treated base, construction of new asphalt concrete pavement, adjustment of sewer manholes and water valve boxes, signing and striping, traffic control, water pollution control, and all related work.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT