Access the Full Project by Clicking here!
Bidjugde
JOB
Mammoth Drive Storm Drain Repair 2020
BID DATE
08/20/20 - 11:00
AGENCY
Shasta County
ESTIMATE
$227,819
SCOPE
The work in general consists of removing approximately 396 ft. of 24" Corrugated Metal Pipe (CMP) storm drain pipe and replacing with 24" plastic pipe smooth wall. Scope of work shall also includes trench excavation, concrete demo and minor concrete work consisting of; driveways approach slabs, headwall, curb inlet catch basins, curb and gutter work. Hot Mix Asphalt (HMA) pavement repairs will also be ncessary from damage caused by trench excavation work and around minor concrete work in contact with AC pavement. swinton@co.shasta.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT