Access the Full Project by Clicking here!
Bidjugde
JOB
Eagle Mountain Pumping Plant Water Distribution System Replacement
BID DATE
08/12/20 - 2:00
AGENCY
Metropolitan WD
ESTIMATE
$5,000,000
SCOPE
The work consists of replacement of the existing potable and non-potable water distribution piping systems, replacement of the existing wastewater piping, replacement of the existing asphalt pavement including grading and drainage improvements and installation of new roadway striping, and other appurtenant work as specified and shown on the drawings. SpecsDesk (213) 217-6515 specsdesk@mwdh2o.com
UPDATES