Access the Full Project by Clicking here!
Bidjugde
JOB
S&H Bridge Replacement
BID DATE
08/13/20 - 3:00
AGENCY
Department Agriculture
ESTIMATE
n/a
SCOPE
The contractor will perform all work below in the performance of this project: - Removal and disposal of existing 16'-10" timber bridge, abutments, and all other materials - Installation of a 24'-1" Span, 6'-6" Rise Aluminum Box Culvert including: - Culvert designed by manufacturer - Headwall and wingwalls designed by manufacturer - Reinforced concrete footings - Installation of riprap protection around structure - Construction of new road embankment over existing road and new culvert - Installation of aggregate surfacing on new road, - Installation of permanent signage - Installation of barricade boulders to control user traffic https://beta.sam.gov/opp/454dc446b3394fa6aadf8bf6059a8340/view?index=opp&page=1&keywords=&inactive_filter_values=false&opp_publish_date_filter_model=%7B%22timeSpan%22:%227%22%7D&date_filter_index=0¬ice_type=o&pop_state=NM

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT