Access the Full Project by Clicking here!
Bidjugde
JOB
Panorama Storm Drain Pipe Replacement
BID DATE
08/11/20 - 3:15 REAL-TIME
AGENCY
Fountain Hills
ESTIMATE
n/a
SCOPE
The project includes the removal of approximately 2,950 LF of existing deteriorating corrugated metal pipe storm drain, three (3) catch basins, six (6) concrete headwalls, five (5) side inlet storm drains, and the removal, salvage and replacement of two (2) fire hydrants, three (3) streetlights, riprap erosion protection, and various landscaping and plantings, and the removal and replacement of associated pavement, concrete curb and gutter, concrete vertical curb and concrete sidewalk and the protection in place of two (2) existing retaining walls possibly requiring shoring. The project includes the installation of approximately 2,970 LF of rubber gasketed reinforced concrete pipe (including both standard and radius pipe), three (3) City of Phoenix SD P1569 modified catch basins, seventeen (17) concrete storm drain manholes, six (6) concrete headwalls with safety rail and access barriers, and the replacement of two (2) fire hydrants, three (3) streetlights, associated pavement, concrete curb and gutter, concrete vertical curb and concrete sidewalk. Panorama Drive is expected to be open to traffic during construction unless approved by the Town Engineer Justin T. Weldy, Public Works Director (480) 816-5133 jweldy@fh.az.gov
UPDATES