Access the Full Project by Clicking here!
Bidjugde
JOB
Brian Head Town Trail Phase 2 Bristlecone Pond Trail
BID DATE
07/15/20 - 2:00
AGENCY
Brian Head
ESTIMATE
n/a
SCOPE
The project includes furnishing labor and materials to construct a 2,700-foot long 8-foot wide extension to the Brian Head Town Trail running parallel to Utah State Route 143, a 2,150-foot long 10-foot wide trail around the Bristlecone Pond, and a 400-foot long 8-foot wide trail connecting the new trail system to the Chair 1 restroom. robr@racivil.com abiasi@bhtown.utah.gov
PREBID
7/9/2020 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT