JOB
Levee Repair Site 1151 11
BID DATE
07/29/20 - 1:00
AGENCY
Department Defense
ESTIMATE
$10,000,000
SCOPE
The repair of this site will include removal of the existing emergency berm, removal of underground pipes at the toe of the levee and construction of a new seepage berm extending approximately 150 feet from the levee toe and approximately 1800 feet long. The berm may include but is not limited to any of the following materials; filter sand, geotextile, drain rock, levee fill, coarse rock, or rip rap. Construction of a new aggregate surfaced road and surface drainage system will also be included in this project.