Papermill Road
BID DATE
08/11/20 - 2:00
AGENCY
Taylor
ESTIMATE
n/a
SCOPE
Papermill Road: Foothills Blvd to 700 Street West: Installation of approximately 2000 tons of Asphalt Concrete, 600 feet of storm drain culverts, 6 storm water area drains, 6 storm water catch basins, 3000 linear feet of ribbon curb, 3000 linear feet of vertical curb and gutter, 4 sidewalk ramps, and other items associated with the widening of Papermill Road. Painted Sky Engineering & Survey, LLC Attn: Doug Brimhall, PE 176 N. Main Street Snowflake, AZ 85937 (928) 537-7218 geri@tayloraz.org