JOB
(DESIGN BUILD) Verde Connect Road SR 260 Cornville Rd
BID DATE
12/31/20 - 5:00
AGENCY
Yavapai County
ESTIMATE
$50,000,000
SCOPE
AWARD 11/2020: The project is anticipated to be constructed in two phases. Phase 1 would include construction of approximately 1.85 miles of new 2-lane roadway that will connect State Route 260 to a new bridge that crosses the Verde River about 1.25 miles east of SR 260. Continuing 0.6 miles east of the Verde River, the Verde Connect roadway will terminate and a connector road will branch approximately 1.1 miles to the southeast to connect with existing Middle Verde Road. Phase 2 of the project would continue the Verde Connect road from the intersection with the connector road to Cornville Road. Phase 1 of the project is currently funded for construction. Phase 2 will be included should additional funding be allocated to the project. This project includes Federal Funds. Roger McCormick, P.E. Assistant Public Works Director Telephone: (928) 771-3183 E-Mail: roger.mccormick@yavapai.us
UPDATES