Access the Full Project by Clicking here!
Bidjugde
JOB
Alto Palm Water Main Replacement
BID DATE
07/30/20 - 2:15 REAL-TIME
AGENCY
El Mirage
ESTIMATE
n/a
SCOPE
The primary project Base Bid item work will consist of the installation of approximately 2,600 linear feet of 6-inch C900 DR18 CL235 PVC water main; installation of 69 new 1” Municipex water service lines with new meter boxes, valves, and fittings; removal and replacement of street pavement sections; and construction of other related appurtenances and items of work within an existing Public Utility Easement between Alto Street and Palm Street from Thunderbird Road to End Street. Additional work includes, but is not limited to, the removal and replacement of curb and sidewalk, abandonment of existing water lines after the new water main has been placed in service, valve frame and cover adjustments, traffic control, mobilization and site restoration. There are also two alternate bids: Alternate Bid No. 1 includes only improvements between Thunderbird Road and Ventura Street while Alternate Bid No. 2 only includes improvements between Thunderbird Road and Well Street. The revisions from the Alternate Bids and the Base Bid designs are shown on Sheet ALT of the plans and cataloged in the Bid Schedules. bchristo@elmirageaz.gov REDPOINT-base $606-457 alt1- $240,397 alt2- $459,973 alt3- $287,609 SCHOLZ-base $481,149 alt1- $181,957 alt2- $372,164 alt3- $253,311 FISHEL-base $721,909 alt1- $277,071 alt2- $532,052 alt3- $324,321 STANDARD-base $674,195 alt1- $273,523 alt2- $499,422 alt3- $318,500 B&F-base $638,155 alt1- $212,906 alt2- $476,145 alt3- $265,501 SELLERS&SONS-base $523,003 alt1- $230,810 alt2- $418,232 alt3- $280,600 REVOLUTION-base $425,017 alt1- $123,223 alt2- $237,572 alt3- $198,965
UPDATES