Access the Full Project by Clicking here!
Bidjugde
JOB
2020B 05 Waterline Improvement State Street 700 South 1450 South
BID DATE
07/22/20 - 2:30
AGENCY
Clearfield
ESTIMATE
n/a
SCOPE
The work includes furnishing all labor, tools, materials, equipment, transportation, and services required for construction of the above project; consisting of the following items of work: mobilization; obtaining all bonds and insurance; remove and replace concrete curb and gutter; remove and replace approximately 3,500 lineal feet of concrete sidewalk (UDOT approved mix); remove and replace stamped concrete, furnish and install handicap ramps; furnish and install approximately 4,380± lf. of 10-inch and 180± lf of 8” C-900 DR18 pvc culinary pipe; waterline connections and disconnects; furnish and install new fire hydrants, furnish and install bituminous asphalt (UDOT approved), replace landscaping and all appurtenant work in accordance with the Drawings and Specifications prepared by the Engineer, CEC, Civil Engineering Consultants, PLLC. Wendy Page +801 (525) 2707 wendy.page@clearfieldcity.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT