Access the Full Project by Clicking here!
Bidjugde
JOB
Centennial Way Waterline Replacement
BID DATE
07/15/20 - 2:00
AGENCY
North Salt Lake
ESTIMATE
n/a
SCOPE
The work to be performed consists of furnishing all labor, tools, materials, equipment, transportation, and services required for installing approximately 2,000 LF of 8-inch PVC waterline, 100 LF of 6-inch PVC waterline, fittings, fire hydrants, service laterals, water meters and setters. Installation of waterline will require trench excavation in street, replacing asphalt, concrete, connecting adjacent waterlines, installation of new collars for water valves; all in accordance with the Drawings and Specifications prepared by the North Salt Lake City Engineering Department. gary.kobzeff@nslcity.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT