Access the Full Project by Clicking here!
Bidjugde
JOB
Almaden Expressway Pavement Rehabilitation Blossom Hill Road Harry Road
BID DATE
07/16/20 - 2:00
AGENCY
Santa Clara County
ESTIMATE
n/a
SCOPE
The Work consists of supplying labor, materials & equipment as required for pavement rehabilita­tion on Almaden Expressway from Blossom Hill Road to Harry Road. It covers: Traffic Control System; Stormwater Pollution Prevention Plan SWPPP ; Mobilization; Potholing ; Remove Existing Portland Cement Concrete (PCC); Roadway Excavation for Pavement Repair; Cold Plane Asphalt Conform; Cold In-Place Pavement Recycling (CIR); Paving Interlayer Reinforcing Gtid; Hot Mix Asphalt (HMA) for Repair & Over/av; PCC Curb & Gutter/Sidewalk/Driveway Approach/ Pedestrian Ramps; Adjust Existing Manhole/Monument/Water Valves/Detector Handholes to CIR & New Grade; Roadside Sign; Thermoplastic Pavement Stripe/Marking; Painted Curb; Furnish & Install Temporary Video Detection System; Adjust Existing Electrical Pullbox to Grade; Inductive Loop System; Alpha Battery Backup Cabinet System & All Other Items of Work not mentioned above that are required by Plans, County Standard Specifications and these Special Provisions. kim.coffin@rda.sccgov.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT