Access the Full Project by Clicking here!
Bidjugde
JOB
Bob Stump Happy Valley Parkway (303-A-(227)T)
BID DATE
09/18/20 - 11:00 LIVE!
AGENCY
ADOT
ESTIMATE
$29,363,605
SCOPE
The proposed project is located in Maricopa County within the City of Peoria, starting south of Happy Valley Parkway (MP 125.18) and ending north of Lake Pleasant Parkway (MP 131.91). The proposed work consists of constructing an interim four foot asphaltic concrete pavement shoulder in the median of SR303L and constructing two AASHTO Type VI-S concrete girder bridges over the Beardsley Canal. At Jomax Parkway the proposed work includes: constructing two AASHTO Type V concrete girder bridges over Jomax Parkway; constructing three PCCP general purpose lanes of SR303L; and constructing Jomax Parkway including pavement, drainage, City of Peoria water line crossing, lighting, striping and signals. The project also includes signing and marking along SR303L and wrong way signage and thermal detection cameras at the Jomax Parkway traffic interchange.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT