Access the Full Project by Clicking here!
Bidjugde
JOB
Pure Water Oceanside Conveyance
BID DATE
07/1/20 - 1:00
AGENCY
Oceanside
ESTIMATE
$9,100,000
SCOPE
Two new injection wells (Wells 1 and 6) and one optional well (Well 3) will be constructed to enable water produced by the AWPF to be conveyed to the groundwater basin, inclusive of injection well supply pipeline, and flushwater pipelines. Construction shall include but not be limited to open cut pipeline installation, civil site work and grading, concrete construction, injection well vault construction, piping, mechanical, electrical, instrumentation, controls, SCADA systems, and equipment installation. Adam HochPE City of Oceanside Water Utilities 300 N Coast Hwy Oceanside, CA 92054 Tel:(760) 435-5800 Fax:(760) 435-5821 ahoch@hochconsulting.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT