Lower Main Street Asphalt Rehabilitation
BID DATE
07/2/20 - 9:00
AGENCY
Placerville
ESTIMATE
n/a
SCOPE
This project will consist of applying Type 2 Slurry per 2018 State Standard Specification 37-3 to the asphalt street surface to extend its usable life. This project is locally and state funded and is a prevailing wage project. The project location will begin where Main Street crosses under Hwy 50 on its western limit. The eastern limit will be past the intersection of Main Street and Spring Street, up to the intersection of Spring Street and Highway 50 at the southern crosswalk. The project contains an estimated 179,000 SF of roadway surface from the western side of the intersection of the of Main Street (HWY 49) and Spring Street, beyond the intersection of Main Street and Pacific Street (Hwy 49), and continues on Highway 49 up to the intersection of Sacramento Street/Pacific Street (Hwy 49). The eastern limit is at the intersection of Main Street and Sacramento Street, at the west side of the westernmost crosswalk. nstone@cityofplacerville.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT