Access the Full Project by Clicking here!
Bidjugde
JOB
Silva Valley Pkwy Bike Path Drainage Improvement
BID DATE
07/2/20 - 2:00
AGENCY
El Dorado County
ESTIMATE
$230,000
SCOPE
The Work to be done is shown on the Plans, and generally consists of, but is not limited to: Constructing drainage improvements along the Silva Valley Parkway Class I Bike Path. Drainage improvements include construction of interceptor swales, HMA shoulder ditches, HMA overside drains, pipe drainage inlets, plastic pipe culverts, hydroseeding, rock slope protection, HMA dike, and HMA paving. Other items or details not mentioned above, that are required by the plans, Standard Plans, Standard Specifications, or these Special Provisions must be performed, constructed or installed. https://zoom.us/j/96245383014, (669) 900-9128 US (San Jose), (346) 248-7799 US (Houston), (253) 215-8782 US (Tacoma). jennifer.rimoldi@edcgov.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT