Access the Full Project by Clicking here!
Bidjugde
JOB
2019 Pavement Overlay Various Streets
BID DATE
06/3/20 - 12:00
AGENCY
Redwood City
ESTIMATE
n/a
SCOPE
The work generally consists of streets overlay, including: Notification of residents, posting “No Parking” signs and traffic control; Asphalt Concrete Spot Reconstruction; Remove existing thermoplastic markings and raised markers; Street sweeping prior to and after resurfacing; Asphalt Concrete Area Grind and Pave; Resurfacing City streets with HMA overlay; Temporary traffic delineation;Adjust utilities lid to the new grade; Installation of new markings and permanent striping; Dust alleviation and control, site cleanup and Detector loop installation.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT