Access the Full Project by Clicking here!
Bidjugde
JOB
2019 Interceptor Outfall Phase 2
BID DATE
06/25/20 - 2:00
AGENCY
Ripon
ESTIMATE
$1,190,000
SCOPE
The work is described generally as mobilization and demobilization, pre-and post-construction closed circuit television (CCTV) inspection, pipeline cleaning, pipeline testing, manholes modification and rehabilitation (MH-11), installation of temporary access locations and rehabilitation of 2,896 linear feet of 24-inch ACP forcemain from MH-5 to MH-11 parallel to the Laguna de Santa Rosa by pressurized cured-in-place pipe (PCIPP) lining method. The work includes pressurized cured-in-place pipe lining of the existing 24-inch ACP. vgarrett@rpcity.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT