Access the Full Project by Clicking here!
Bidjugde
JOB
Marble Arno Storm Pump Station Pond
BID DATE
06/23/20 - 1:30
AGENCY
Albuquerque
ESTIMATE
n/a
SCOPE
The project is to construct a new storm water pump station and detention pond in downtown Albuquerque. This project is replacing the existing North Broadway Storm Water Pump Station. The project site improvements include construction of a 100 cfs pump station, a 20 ac-ft detention pond, a mechanically cleaned bar screen, concrete wetwell and valve vault, and a 800 sf electrical building, Other improvements include the installation of approximately 550 LF of 54-inch steel forcemain, approximately 2,000 LF of storm drain up to 66-inches in diameter, roadway reconstruction of portions of Broadway Blvd., Marble Ave., and Arno St., complete with concrete façades and landscaping, and other work to provide a complete and functioning project. codys@smithengineering.pro

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT