jobs bidding

Access the Full Project by Clicking here!

- SIGN UP -
Experience Simplicity
 
 
 
 
 
JOB
Fresno Canal McKinley Avenue
BID DATE
06/4/20 - 2:00
AGENCY
Fresno County
ESTIMATE
$1,785,000
SCOPE
The work to be done consists, in general, of removing and replacing the existing Fresno Canal Bridge on McKinley Avenue with a new single span bridge 61’-0” in length, 32’-0” wide to meet current standards. The new bridge will be located along the same road alignment with a slightly higher profile. The new bridge construction consists of installation of cast-in-place concrete deck and concrete barriers over voided PC/PS concrete slab girders, abutments, concrete piles, concrete channel lining and rock slope protection. The project also includes reconstruction of approximately 467 feet of Asphalt Concrete bridge approach roadways. Four new canal access roads will be constructed at different alignments with Asphalt Base on top of compacted soil to replace the abandoned ones. Full street closure is required during construction, and a detour will be provided. DesignServices@fresnocountyca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT