Euclid Avenue Reconstruction
BID DATE
06/10/20 - 1:30
AGENCY
Gila Bend
ESTIMATE
n/a
SCOPE
This federally funded project consists of the reconstruction of Euclid Avenue from Pima Street to Renner Street, for a total length of approximately 790 feet. The major items of work include the following construction items: 1. Asphalt Street Pavement – 3” asphalt on 8” aggregate base 2. Concrete Sidewalk (5’ Wide) 3. Concrete Sidewalk Curb Ramps 4. Concrete Valley Gutter and Aprons 5. Concrete Alley Driveway 6. Asphalt Pavement Removal 7. Adjust Existing Manholes and Valves 8. Subgrade Preparation 9. Miscellaneous Work Item Installations, Removals, and Relocations svillegas@gilabendaz.org
UPDATES
  • 05 21 20 - Prebid date changed to 5/27, addendum added
  • 06 02 20 - Addendum 2 added, planholders list added
PREBID
5/27/2020 10:00