jobs bidding

Access the Full Project by Clicking here!

- SIGN UP -
Experience Simplicity
 
 
 
 
 
JOB
Gale Wilson Blvd Bus Stops
BID DATE
06/4/20 - 2:00
AGENCY
Fairfield
ESTIMATE
n/a
SCOPE
The work consists of constructing two new bus stops which includes but is not limited to the sawcutting of existing asphalt concrete pavement and Portland Cement Concrete(PCC) sidewalks and their removal for constructing new flatter cross slope sidewalks, new bus stop PCC standing area pads and bus pads, and the removal of turf/soil and any tree roots for the new excavated concrete/aggregate base rock sections for the new standing area pads, modifications of irrigation systems and reestablishment of new matching sod turf and new asphalt concrete patches around new concrete bus pads

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT