Access the Full Project by Clicking here!
Bidjugde
JOB
2020 Concrete Replacement - Woodland
BID DATE
05/18/20 - 2:00
AGENCY
Woodland
ESTIMATE
$50,000
SCOPE
Installation of new sidewalk at various locations. City shall perform USA of location, removal of damaged sidewalk, preparation of subgrade, and provide traffic control throughout the duration of the project including the Contractor’s performed work. Contractor shall perform all flatwork for installation of a new PCC sidewalk and connection to the existing sidewalk, curb, and gutter including form, pour, places, scores and finish of the new PCC sidewalk.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT