Parkside Drive Broadway Rehab
BID DATE
05/19/20 - 2:30
AGENCY
Walnut Creek
ESTIMATE
$1,870,000
SCOPE
This Project includes pavement rehabilitation on Parkside Drive (from San Juan Avenue to North Civic Drive) and North Broadway (from Parkside Drive to Ygnacio Valley Road) Traffic Control • Concrete Removal • Tree Removal • Drainage Improvements • Concrete Curb, Gutter, Sidewalk, Driveways, and Curb Ramps. • Base Repairs • Pavement Surface Reconstruction • Cold Milling Asphalt Concrete Pavement • HMA Paving (full-depth up to 10 inches, HMA overlay up to 2.5 inches) • Utility Adjustment • Traffic Striping and Markings • Signage • Electrical (including fiber optic conduit infrastructure) wong@walnut-creek.org smartinez@walnut-creek.org