Median Modification Dual Left Turn Lane Ming Ave Stine Rd
BID DATE
05/21/20 - 11:00
AGENCY
Bakersfield
ESTIMATE
$322,269
SCOPE
The work to be performed consists, in general, of sawcutting and removing existing median islands and hot mix asphalt on Ming Avenue at the Ming Avenue and Stine Road intersection; installing type M median curbs and textured paving (median hardscape); relocating roadside signs (speed limit); adjusting to grade – 6 traffic signal pull boxes – 1 traffic signal vault – 1 storm drain manhole frame and cover; removing existing traffic stripes and pavement markings; installing new traffic stripes and pavement markings; and installing new type D and type E vehicle detector loops. Shane Lowe SLOWE@bakersfieldcity.us Join Zoom Meeting https://bakersfieldcity.zoom.us/j/91282174949 Meeting ID: 912 8217 4949 Password: 060906