Mill Creek Sediment Basin Floor
BID DATE
05/12/20 - 4:00
AGENCY
Davis County
ESTIMATE
n/a
SCOPE
Davis County recently had a new sediment Basin built west of 1100 West in West Bountiful on Mill Creek. We would like to put a concrete floor in the proposed basin. This RFP is for the construction of the floor and ramp into the new basin. The proposed floor must be six inches of concrete reinforced with welded wire mesh placed on eight inches of structural fill and twelve inches of rock. The ramp must be constructed out of eight inches of concrete reinforced with #4 bar 8” O.C. The basin is roughly 95’ wide and 300’ long. Construction on the project must take place after runoff is complete but before the end of the year. Dax Teuscher +1 801-451-3492 dteuscher@co.davis.ut.us SciQuest