Smoke Tree Pavement Repair
BID DATE
04/30/20 - 2:00
AGENCY
Prescott
ESTIMATE
n/a
SCOPE
This project generally consists of milling 2" of the existing asphalt pavement and replacing with new asphalt pavement and an Engineered Paving Mat as shown on the Plans and in the Specifications and/or milling 4" and replacing with new asphalt on Smoke Tree Lane as shown in the Specifications. The work includes pavement repairs, the adjustment of utility covers to finish grade and the restoration of disturbed traffic striping. The project also includes curb, gutter and handicap ramp replacements as shown on the plans.