Access the Full Project by Clicking here!
Bidjugde
JOB
2020 Watermain Replacement Fire Flow Enhancement
BID DATE
05/28/20 - 2:00
AGENCY
Incline Village GID
ESTIMATE
$610,000
SCOPE
Schedule A, Martis Peak Rd: Replace 1125 LF existing (E) 8” OD steel watermain with 8” DR-14 PVC or Class 350 DIP watermain in Washoe Co. ROW. Connect to 13 (E) domestic service lines. Connect to (E) 8” watermain in Washoe Co. ROW. Construct 3 fire hydrant assemblies. Salvage 1 (E) fire hydrant. Abandon (E) 8" OD steel watermain.Schedule B, Rifle Peak Ct.. Replace 260 LF (E) 8” OD steel watermain with 8” DR-14 PVC or Class 350 DIP watermain in Washoe Co. ROW. Reconnect to 3 (E) domestic service lines. Construct 1 fire hydrant assembly. Salvage 1 (E) fire hydrant. Abandon (E) 8" OD steel watermain.Schedule C, SR28 Undercrossing: Slip-line approximately 120 LF 10” DR-14 fusible PVC into (E) 14” welded steel watermain in NDOT ROW. Inject grout into casing. Reconnect to (E) 14” steel watermain in NDOT ROW. Ronnie Rector - 775-832-1267 rlr@ivgid.org
PREBID
4/29/2020 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT