Big Dry Creek Diversion Channel BDCDC Slope Reconstruction
BID DATE
04/28/20 - 2:00
AGENCY
Fresno
ESTIMATE
$141,000
SCOPE
During installation of the City of Fresno’s (City) Friant-Kern Canal Pipeline (Pipeline) a major storm event caused erosion and slope failure under the Foothill Lane Bridge. The City has determined that measures will be taken to address the resulting conditions, including: (1) removing slope failure material and vegetation under the bridge; and (2) place soil cement fill material to restore the slope under the bridge and around the storm drain inlet piping on the north and south side of the bridge Iris Yi - 559-621-8361 iris.yi@fresno.gov