JOB
Alley Sanitation Rehab North South Alley Schaefer Ave G St
BID DATE
05/6/20 - 10:00
AGENCY
Chino
ESTIMATE
n/a
SCOPE
Work may include but not be limited to the following: furnish all labor, materials and equipment to remove and dispose of existing alley pavement surface and base to a minimum of 8” below top of pavement, construct AC pavement section containing 3” AC over 5” of compacted crushed miscellaneous base, construct 4†PCC alley gutter, accessible walk and curb ramps, PCC alley approach, adjust various utility manhole, valve can and lids, pull boxes, water meters and water meter boxes, remove and replace water meter boxes. Daniel Vest - 909-334-3367 dvest@cityofchino.org