Access the Full Project by Clicking here!
Bidjugde
JOB
Measure B Group 2 Pavement Rehabilitation
BID DATE
04/28/20 - 2:00
AGENCY
Larkspur
ESTIMATE
n/a
SCOPE
The work generally consists of mobilization; setup and maintenance of traffic control system; developing and implementing a water pollution control program; potholing; pulverization; quicklime and/or cement soil treatment; removing and disposing of pavement roadway; cold planing; placing pavement fabric and hot mix asphalt (HMA) materials; pruning and removing tree roots under PCC/HMA repairs; lowering and raising utility covers; replacement of traffic striping and pavement markings; installing shoulder backing; cleanup of the project area and other items of work as shown on the plans. Alvin Tan, Project Manager, atan@cityoflarkspur.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT