Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) FWRC Secondary Treatment Aeration Basins Clarifiers 150 MGD Expansion
BID DATE
07/6/20 - 2:00
AGENCY
Clark County Water Reclamation
ESTIMATE
$143,000,000
SCOPE
The new facilities will consist of three aeration basins, three 140-foot diameter clarifiers with 16-foot side water depth, blower/electrical building with electrical feed and 4 blowers, and return activated sludge (RAS)/waste activated sludge (WAS) pump station with 5 RAS pumps, 5 WAS pumps, and 4 scum pumps. At the outlet, a 96-inch pipe approximately 3000 linear feet in length will connect to the existing Secondary Effluent Structure. The project will require modification to the existing Secondary Effluent Structure to accommodate the additional flows.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT