Arches Storm Drain Dry Weather Diversions
BID DATE
04/14/20 - 10:00
AGENCY
Newport Beach
ESTIMATE
$390,000
SCOPE
HOAG DIVERSION:The work necessary for the completion of this contract consists of mobilizing, providing traffic control, erosion control, staking and survey monument restoration, verifying utility locations and coordinating with utility companies; clearing and grubbing; completing site demolition and core drilling existing manhole structure, dewatering if required, earthwork, and site grading; constructing diversion improvements including but not limited to modified drop manhole connection to existing sewer manhole, cast-in-place diversion manhole & junction structure, precast meter box and manholes components, PVC Schedule 80 pipe and fittings, furnishing and installing miscellaneous metals, composite manhole covers, molded fiberglass grates, polypropylene steps, utility pumps, control switches, and control panel, check valves, flow meters, cleanout facilities, concrete walk, curb and gutter, retaining curb; asphalt concrete trench resurfacing, electrical site improvements, SCADA Control System improvements, re-landscaping and irrigation replacements; preparing as-built drawings; and all other work required by the contract documents.OLD NEWPORT DIVERSION:The work necessary for the completion of this contract consists of mobilizing; providing traffic control; erosion control; staking and survey monument restoration; verifying utility locations and coordinating with utility companies; clearing and grubbing; completing site demolition and core drilling existing manhole structure; dewatering; earthwork and site grading; constructing diversion improvements including but not limited to modified drop manhole connection to existing sewer manhole, cast-in-place diversion curb and diversion junction structure, precast meter box, RCB access shaft, and pump wetwell, PVC Schedule 80 pipe and fittings; furnishing and installing miscellaneous metals, composite manhole covers, molded fiberglass grates, polypropylene steps, utility pumps, control switches, and control panel, check valve, plug valve and valve box, flow meter, rain gauge, cleanout facility, concrete walk, modified commercial driveway paving, and curb and gutter; electrical site improvements; SCADA Control System improvements; landscaping and irrigation replacements; preparing as-built drawings; and all other work required by the contract documents. Bob Stein - 949-644-3322 rstein@newportbeachca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT