Access the Full Project by Clicking here!
Bidjugde
JOB
West Street Paving
BID DATE
02/27/14 - 2:00
AGENCY
Berkeley
ESTIMATE
$73,500
SCOPE
The work to be done consists, in general, of traffic control, potholing to verify existing underground utilities location and elevation, roadway excavation, removal and installation of existing Portland Cement Concrete (PCC) sidewalk, curb and gutter, curb ramp, removal of Asphalt Concrete (AC) pathway, roadway Aggregate Base rock (AB) and Aggregate Subbase (AS) as shown on the plans. Work also includes placing class 2 AS, class 2 AB and AC roadway and pathway, installation of rockslope protection and truncated dome, adjusting existing irons to grade and improvements for 2111 West Street as specified. All work shall be performed in accordance with these plans and specifications. srose@cityofberkeley.info

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT