Access the Full Project by Clicking here!
Bidjugde
JOB
Golden Hills Pump Station Rehabilitation
BID DATE
04/3/20 - 2:00
AGENCY
Salt Lake
ESTIMATE
$276,000
SCOPE
The project consists of partial demolition of the existing vault deck; removal of the existing vault entrance, stairway, piping and appurtenances, pumps, pressure tank, and pump station bypass vault; protecting and salvaging the rock wall; construction of a new covered entrance and new sump; installation of a new stairway, piping and appurtenances, pumps, pressure tanks, heater, ventilation fan, louvers, duct work, generator pad, generator, equipment access hatch, retaining wall, concrete stairs and walkway, and telemetry equipment, including an RTU panel, antenna, flood switches, intrusion switches, generator status, ATS position, and pressure transmitters; relocation of existing electrical facilities and water meters; coring through the concrete vault for installation of the intake louver and piping; and site restoration including all site grading, decorative gravel, rock walls, rock stairway, and seeding. Kevin Kranendonk +801 (483) 6841 kevin.kranendonk@slcgov.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT