2020 Garland City Wastewater Treatment System Capital Improvement
BID DATE
04/10/20 - 4:00
AGENCY
Garland City
ESTIMATE
n/a
SCOPE
The Project consists of constructing a 0.45 MGD wastewater treatment facility and includes the following work: Construction of a headworks building, an operations building, an Aero-Mod SEQUOX Process treatment system, site work, influent pump station, wastewater piping and connecting structures, site work, electrical, plumbing, heating and air conditioning, site utilities, automation and controls, and miscellaneous structures. The Owner has pre-selected the large equipment components. The project requires installation and connection of grit screening, grit removal equipment, odor removal equipment, Aero-Mod SEQUOX process, sludge dewatering equipment, ultraviolet disinfection equipment, and reaeration equipment. pocatello@cascade-earth.com