jobs bidding

Access the Full Project by Clicking here!

- SIGN UP -
Experience Simplicity
 
 
 
 
 
JOB
2020 Citywide Slurry Seal
BID DATE
03/26/20 - 2:00
AGENCY
Sonoma
ESTIMATE
$251,100
SCOPE
In general, the work consists of street and multi-use trail (pathway) surface treatment (slurry seal) for various streets throughout the City, including surface preparation, crack seal, slurry seal, removal and replacement of pavement striping and markings, reconfiguration of striping and signing as provided for in plan sheet C-101 and C-102 and as directed by the Engineer, street signage installation and replacement, installation of one radar speed feedback sign system, object marker installation as directed by the Engineer, protection of existing utility structures, curb and gutter, cross gutter, traffic control, water pollution control and other related work as set forth on the project Figures, Plans and Specifications. matt.wargula@ghd.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT