Access the Full Project by Clicking here!
Bidjugde
JOB
Duck Creek Wastewater Phase I
BID DATE
03/27/20 - 2:00
AGENCY
Kane County
ESTIMATE
n/a
SCOPE
The Duck Creek Wastewater Phase 1 project consists of installing approximately 11,200 linear feet of gravity sewer pipe, constructing a sewer lift station, installing approximately 6,200 linear feet of pressure sewer pipe, construction and tie-ins for 53 sewer connections, and a septage receiving station. The project also includes the installation of water, electric, and communication utilities needed for the project. Bidding Documents may be examined and downloaded online at www.sunrise-eng.com; or viewed at the office of the Engineer, Sunrise Engineering, Inc. A pre-bid conference will be held at 1:00 PM local time on March 12, 2020, at the Cedar Mountain Fire Station, 3620 Mammoth Creek Road, Duck Creek Village, Utah, 84762. Attendance at the pre-bid conference is highly encouraged, but is not mandatory.
PREBID
3/12/2020 1:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT